|
The Trakia motorway ((ブルガリア語:Aвтомагистрала „Тракия“, ''Avtomagistrala "Trakiya"'')) or Thrace motorway, designated A1, is a motorway in Bulgaria. It connects the capital city of Sofia, the city of Plovdiv and the city of Burgas on the Black Sea coast. The motorway is named after the historical region of Thrace, the northern (Bulgarian) part of which it spans from west to east. The total length of Trakia motorway is and the final section opened on 15 July 2013 after 40 years of construction.〔http://www.publics.bg/en/news/10256/Bulgaria%E2%80%99s_1st_Fully_Accomplished_Motorway_Opened_July_15.html〕 Trakia motorway connects with the Sofia ring road to the west allowing fast access to the A2 Hemus motorway and A6 Lyulin motorway. Future interchanges with the planned Kalotina motorway and Sofia Northern Bypass motorway are expected to ease the main transit traffic around Sofia. At its east end Trakia motorway will merge with the planned A5 Cherno More motorway providing fast access from the south to the city of Varna and the beach resorts on the Black Sea. A4 Maritsa motorway (currently under construction) linking Trakia motorway with the border crossing with Turkey at Kapitan Andreevo branches off at Orizovo Interchange located at kilometer 169. The interchange is situated between Plovdiv and Chirpan, roughly 5 km north of Parvomay. ==History== The construction of the motorway began in 1973 and the first 10 km from Sofia to Novi Han entered in service in 1978. In 1984 the motorway reached Plovdiv, the second largest city in Bulgaria. In 1995 a 32 km section between Plovdiv and Plodovitovo interchange was completed with EBRD co-financing. In 2000 EIB loan was secured for the construction of two sections, between Orizovo interchange and Stara Zagora (lot 1), and lot 5, between Karnobat and Burgas, fourth largest city, situated at the Black sea coast. The motorway reached Stara Zagora in 2007, and lot 5 entered in service in 2006. Meanwhile, in 2005 a controversial concession contract was signed by the Bulgarian government and a Portuguese-led consortium. The concession was granted for 35 years without tender procedure and included 433 km from the Serbian border, at Kalotina border checkpoint, to Burgas. However, the contract was cancelled in 2008 and the sections between Stara Zagora and Karnobat (lots 2, 3 and 4) were approved for EU funds financing. In 2009 and 2010, tenders for the construction of Stara Zagora - Nova Zagora, Nova Zagora - Yambol-west interchange, and Yambol-west interchange - Karnobat sections, totalling 116.8 km, were conducted and contracts were signed. The sections between Stara Zagora and Yambol-east interchange opened to traffic in mid-2012, while the last remaining section between Yambol-east interchange and Karnobat interchange was completed on 15 July 2013. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Trakia motorway」の詳細全文を読む スポンサード リンク
|